Every job below is one we do ourselves across Mission.
We frame new decks with treated lumber or steel ledger hardware, set footings below the depth Mission's code calls for, and lay decking in the board pattern you want. Takes anywhere from a few days for a small platform to a couple weeks for a multi-level deck with stairs and built-in benches.
Sagging joists, popped nails, soft spots and cracked boards get fixed without tearing the whole deck apart. We check the ledger board connection and footings first, because a wobble you feel at the railing often starts somewhere else.
Wood decks down here take a beating from UV, not just rain, so we use a sealer rated for high sun exposure. We pressure wash, let the wood dry fully, then apply stain in conditions that won't flash-dry it onto the surface.
We'll draw up a layout that fits your yard, whether that's a single level off the kitchen door or a multi-tier deck around a pool. You see the board direction, railing style and stair placement before we order any material.
Composite boards cost more than pressure-treated pine but don't split or warp the way wood does in this heat. We install hidden fastener systems so the surface stays clean, no screw heads showing.
Loose balusters, rotted posts and railings that don't meet the 4-inch gap code all fall under this. We rebuild to current code even on an older deck, because a railing that passes inspection is one that actually holds weight.
Individual boards that have cupped, split or rotted get swapped out without disturbing the rest of the deck. Matching old pressure-treated lumber to new is tricky for color, so we talk through whether a full resurface makes more sense.
If the frame underneath is still solid but the decking on top is shot, we strip it down and lay new boards over the existing joists. Cheaper than a full rebuild, and usually a one or two day job.
Shade structures attached to or built over an existing deck, framed to carry the load without putting stress on joists that weren't sized for it. Popular out here, since a deck without shade sits empty most of the afternoon.
Low-voltage lighting run along stair risers, post caps and under the rail for decks used after dark. Wired to a transformer sized for the number of fixtures, not just wherever one happened to fit.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
Deck installation and repair across the Rio Grande Valley.
What comes up once a deck project is underway.
Describe the problem and we will tell you what it probably is. No obligation.